篇一:房建毕业论文

目 录

1 引言 .............................................................. 1

2 施工组织设计编制说明 .............................................. 2

2.1 编制依据 ........................................................ 2

2.2 编制原则 ..............................................(来自:www.zaidian.cOm 书 业网:房建毕业设计).......... 3

2.3 编制内容 ........................................................ 3

3 总体概述 .......................................................... 4

3.1 一般概况 ........................................................ 4

3.2 建筑设计概况 .................................................... 4

3.2.1 室外装修:(由内到外) ......................................... 5

4 施工进度计划和各阶段进度的保证措施 ............................... 14

4.1 施工进度计划编制说明 ........................................... 14

4.1.1 进度计划编制思想 ............................................. 14

4.1.2 施工进度计划 ................................................. 14

4.2 材料采购计划 ................................................... 14

4.3 施工进度计划管理及保证措施 ..................................... 15

4.4 赶工措施 ....................................................... 19

4.4.1 技术措施 ..................................................... 19

4.4.2 经济措施 ..................................................... 20

4.4.3 组织协调措施 ................................................. 21

4.4.4 施工机械设备保证 ............................................. 21

4.4.5 材料计划 ..................................................... 22

4.4.6 劳动力配置及保障措施 ......................................... 22

5 劳动力和材料投入计划及其保证措施 ................................. 22

5.1 组织准备 ....................................................... 22

5.2 完善各项管理制度 ............................................... 23

5.3 劳动力组织计划 ................................................. 23

5.4 材料准备 ....................................................... 23

5.5 工地临时用水、电准备 ........................................... 24

6 施工平面布置 ..................................................... 27

7 主要分部分项工程施工方法和重点、难点分析和解决方案 ............... 29

7.1 测量放线及定位的重点分析和解决方案 ............................. 29

7.1.1 测量工具 ..................................................... 29

7.1.2 测量定位 ..................................................... 30

7.1.3 放线 ......................................................... 30

7.2 基础土方工程施工方法和重点分析和解决方案 ....................... 30

7.2.1 土方开挖 ..................................................... 30

7.2.2 土方外运清理工作 ............................................. 31

7.2.3 沉降观测 ..................................................... 31

7.3 模板工程施工方法和重点分析和解决方案 ........................... 32

7.3.1 材料 ......................................................... 32

7.3.2 柱模板 ....................................................... 32

7.3.3 梁、板模板 ................................................... 33

7.3.4 楼梯模板 ..................................................... 33

7.3.5 接缝要求 ..................................................... 33

7.3.6 现浇结构模板安装允许偏差 ..................................... 34

7.3.7模板拆除 ..................................................... 34

7.4.1 钢筋下料、成形加工 ........................................... 35

7.4.2钢筋焊接 ..................................................... 36

7.4.3 钢筋绑扎 ..................................................... 36

7.4.4 钢筋检查验收 ................................................. 39

7.5 混凝土工程施工方法和重点分析和解决方案 ......................... 40

7.5.1 浇混凝土前的准备工作 ......................................... 40

7.5.2 混凝土材料要求 ............................................... 40

7.5.3 混凝土运输 ................................................... 40

7.5.4 柱混凝土浇筑 ................................................. 40

7.5.5 梁、板混凝土浇筑 ............................................. 41

7.5.6 楼梯混凝土浇筑 ............................................... 41

7.5.7 夏季施工措施 ................................................. 41

7.5.8 雨期施工措施 ................................................. 41

7.5.9 成品保护措施 ................................................. 41

7.5.10 应注意的质量问题 ............................................ 42

7.5.11 施工缝留置与处理 ............................................ 42

7.5.12 混凝土养护 .................................................. 43

7.5.13 混凝土质量检查 .............................................. 43

7.6 脚手架工程和重点分析和解决方案 ................................. 44

7.6.1 落地式双排扣件式钢管脚手架构造要求 ........................... 44

7.6.2 落地式双排扣件钢管脚手架的搭设要求 ........................... 45

7.6.3 落地式双排扣件钢管脚手架的使用规定 ........................... 46

7.6.4 落地式双排扣件钢管脚手架拆除要求 ............................. 47

7.7 砌体工程和重点分析和解决方案 ................................... 48

7.7.1 材料要求 ..................................................... 48

7.7.3 施工操作工艺 ................................................. 49

7.7.4 质量标准 ..................................................... 50

7.8 防水工程和重点分析和解决方案 ................................... 51

7.8.1 铺设卷材 ..................................................... 51

7.8.2 卷材收头处理 ................................................. 52

7.8.3 SBS地面防水工艺 ............................................. 52

7.9 室内外装饰工程和重点分析和解决方案 ............................. 55

7.9.1 室内抹灰施工方法 ............................................. 55

7.9.2 顶棚混合砂浆施工方法 ......................................... 55

7.9.3 卫生间等墙面贴面砖施工方法 ................................... 56

7.9.4 粉刷工程 ..................................................... 56

7.9.5 地面工程 ..................................................... 57

7.10 给排水及电气工程安装和重点分析和解决方案 ...................... 58

7.10.1 给排水工程安装 .............................................. 58

7.10.2 电气工程安装 ................................................ 60

7.11 消防工程 ...................................................... 60

7.11.1 消防弱电施系统施工 .......................................... 61

7.11.2 消防水灭火系统施工 .......................................... 66

8 安全文明施工措施与承诺 ........................................... 74

8.1 安全生产目标及保证措施 ......................................... 74

8.1.1 安全生产目标 ................................................. 74

8.1.2 安全管理措施 ................................................. 74

8.1.3 基础工程安全保证措施 ......................................... 74

8.1.4 高空及立体交叉作业的防护保证措施 ............................. 74

8.1.5 脚手架安全保证措施 ........................................... 75

8.1.6 安全用电和机电设备的安全保证措施 ............................. 76

8.1.7 防火、防爆安全保证措施 ....................................... 77

8.2 文明施工减少扰民,降低环境污染和噪音措施 ....................... 77

9 质量保证措施 ..................................................... 78

9.1 质量控制措施 ................................................... 78

9.1.1 质量目标 ..................................................... 78

9.1.2 质量目标分解 ................................................. 78

9.2 工程质量及创优保证措施 ......................................... 78

9.2.1 创优质量管理组织机构 ......................................... 78

9.2.2 施工准备阶段的质量管理 ....................................... 79

9.2.3 施工过程的质量管理 ........................................... 80

9.2.4 实行“PDCA”循环管理 ......................................... 80

9.3 质量管理措施 ................................................... 81

9.4 质量体系控制措施 ............................................... 82

9.5 质量保证措施 ................................................... 84

9.5.1 材料质量保证措施 ............................................. 84

9.5.2 主要分项工程质量控制措施 ..................................... 87

10 雨季、高温施工措施 .............................................. 89

10.1 雨季施工技术措施 .............................................. 89

10.2 高温季节施工技术措施 .......................................... 89

10.3 冬季施工技术措施 .............................................. 90

11 新技术应用 ...................................................... 90

11.1 粗直径钢筋连接技术 ............................................ 90

11.1.1 焊接施工准备 ................................................ 90

11.1.2 焊接工艺作业 ................................................ 91

11.1.3 接参数 ...................................................... 91

11.1.4 质量检验 .................................................... 91

11.2 企业的计算机应用和管理技术 .................................... 92

11.3 楼板负弯矩筋悬挂施工技术 ...................................... 92

12 绿色施工措施 .................................................... 93

12.2.2 节水与水资源利用 ............................................ 94

12.2.4 节地与施工用地保护 .......................................... 96

12.2.5 环境保护措施 ................................................ 97 12.3 推广应用绿色施工的新技术、新设备、新材料与新工艺 ............. 100 结论 .............................................................. 101 致谢 .............................................................. 103

淮阴工学院毕业设计说明书(论文) 第 1 页 共104页1 引言

建筑施工组织设计是工程项目管理中的重要技术经济文件,是施工准备和施工全过程的核心。施工单位就必须在了解工程规模、特点、技术要求和建设期限等基础上,编制施工组织设计。在施工准备和施工过程中,工程施工组织设计始终起着全局性的指导作用,作为项目管理中的规划性文件,施工组织设计提出了施工中的进度控制、质量控制、成本控制、安全控制、现场管理、各项生产要素管理的目标及技术组织措施。

施工组织就是针对工程施工的复杂性,来研究工程建设统筹安排与系统管理的客观规律的一门学科,它研究如何组织、计划一项拟建工程施工,寻求合理的组织与方法。

工程质量是建设项目的核心,产品(设备、材料)质量是工程质量的前提,雄厚实力的施工队伍、先进科学的管理模式、井然有序的现场组织是工程质量的保障。施工组织设计是贯穿整个工程实施的纽带,它为工程质量提供了方法和手段。

施工组织设计是用来指导整个工程实施全过程中各项活动的技术、经济和组织的综合性文件。它是根据业主和设计方案对工程建设的要求,从工程实施的全过程中的人力、物力和空间等三个要素着手,在人力与物力,主体与辅助,供应与消耗,生产与存储,专业与协作,使用与维护以及空间布置与时间安排等方面进行科学的合理布置,为建筑产品生产的节奏性、均衡性和连续性提供最优方案,从而以最少的资源消耗取得最大的经济效果。它也是对工程实施全过程实行科学管理的重要手段,通过对施工组织的编制,可以全面考虑工程实施全过程的各种施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法、劳动组织和技术经济的组织措施,合理地统筹安排拟定施工进度计划,保证工程按期交付使用。可以使施工企业提前掌握人力、材料和机具使用的先后顺序,合理安排资源的供应与消耗,合理地确定临时设施的数量、规模和用途。通过施工组织的编制还可以预计施工过程中可能发生的各种情况,可能使用的各种新技术,事先做好准备、预防,为施工企业实施施工准备工作和施工计划提供依据。可以把整个全过程的设计与施工、技术与经济、前方与后方和施工企业的全部安排与具体工程的施工组织工作更紧密地结合起来。

篇二:房屋建筑毕业设计最终成果

摘 要

本项目名称为鄢陵祥和花园5#楼位于鄢陵县焉陶路与311国道交叉口向南300米处,建筑单位为郑州弘业建筑工程有限公司许昌分公司。本工程采用砖混结构,建筑高度为20.60m,采用筏板基础,建筑类别为二级,合理使用年限为50年,抗震设防烈度为六度,耐火等级为二级,建筑结构安全等级为二级。通过毕业设计让我们能够全面的掌握建设施工图纸、相关设计规范、施工规范、如何编制施工组织设计。施工组织设计编制必须满足对施工过程起到指导和控制作用,确定基础施工以及主体施工的施工方案,在一定资源条件下实现工程项目的技术经济效益,达到施工效益与经济效益双赢的目的。

关键字:施工组织设计;筏板基础;耐火等级。

Abstract

The project name is Yanling peaceful garden 5 # Yan Tao House in Yanling County Road and State Road 311 intersection south 300 meters, the building units of Zhengzhou Hongye Construction Engineering Co., Ltd. Xuchang Branch. This project uses brick structure, building height of 20.60m, using raft foundation, building category for secondary and reasonable service life of 50 years, six degrees of earthquake intensity, fire resistance rating of 2, the structural safety of the building grade II level. By graduation design allows us to fully grasp the building construction drawings, relevant design specifications, construction specifications, how to prepare construction design. Construction design must meet the construction process play a guiding and controlling role in determining the basis of the construction and the construction of the main construction plan, under certain conditions the resources to achieve the project's technical and economic benefits to achieve the benefits and win-win economic construction purposes.

Keywords: construction design; prestressed; continuous beam。

目 录

第1章 编制依据及原则 ................................................................................................... 1

1.1 编制依据 ................................................................................................................................... 1

1.2 编制原则 ................................................................................................................................... 1

1.3 编制说明 ................................................................................................................................... 1

第2章 工程概况 ................................................................................................................. 3

2.1 工程概况 ................................................................................................................................... 3

第3章 施工部署 ............................................................................................................... 6

3.1 工期目标 ..................................................................................................................................... 6

3.2 质量目标 ................................................................................................................................... 6

3.3 安全目标 ................................................................................................................................... 6

3.4 文明施工目标 ........................................................................................................................... 6

3.5 项目组织机构设置 ................................................................................................................... 6

第4章 施工总平面布置 ..................................................................................................... 9

4.1 施工平面布置原则 ................................................................................................................... 9

4.2 办公及生活设施布置 ............................................................................................................... 9

4.3 施工给排水 ............................................................................................................................... 9

4.4 施工用电 ................................................................................................................................. 10

第5章 施工准备与资源配置计划 ........................................................................................... 12

5.1 总体施工准备 ......................................................................................................................... 12

5.2 劳动力配置计划 ..................................................................................................................... 14

5.3 物资配置计划 ......................................................................................................................... 14

第6章 施工进度计划及保证措施 ................................................................................... 16

6.1 施工进度计划总目标及节点控制目标 ................................................................................. 16

6.2 施工进度计划网络图 ............................................................................................................. 16

6.3 施工进度的调整措施 ............................................................................................................. 16

6.4 施工进度计划管理流程图 ..................................................................................................... 16

第7章 各分部分项施工方法 ........................................................................................... 18

7.1 施工测量的准备 ..................................................................................................................... 18

7.2 基坑开挖 ................................................................................................................................. 18

7.3 基础工程 ................................................................................................................................. 20

7.4 主体结构工程施工部署 ......................................................................................................... 22

7.5 基础模板施工 ......................................................................................................................... 23

7.6 主体模板工程施工技术措施 ................................................................................................. 24

7.7 主体钢筋工程施工技术措施 ................................................................................................. 27

7.8 主体混凝土工程施工技术措施 ............................................................................................. 31

7.9 砌体工程 ................................................................................................................................. 34

第8章 安全保证措施 ....................................................................................................... 37

8.1 安全生产管理目标 ................................................................................................................. 37

8.2 安全生产管理体系 ................................................................................................................. 37

8.3 安全生产防护措施 ................................................................................................................. 37

8.4 临时用电安全管理 ................................................................................................................... 38

8.5 机械生产安全管理 ................................................................................................................. 39

8.6 应急救援和调查处理 ............................................................................................................. 39

第9章 质量保证措施 ....................................................................................................... 41

9.1 组织保证措施 ......................................................................................................................... 41

9.2 建全质量管理制度 ................................................................................................................. 45

9.3 质量管理的技术措施 ............................................................................................................. 45

9.4 主体工程质量控制措施 ......................................................................................................... 45

第10章 环境保护方案 ..................................................................................................... 54

10.1 施工现场环保工作计划 ....................................................................................................... 54

10.2 施工现场环保工作制度 ....................................................................................................... 54

10.3 施工现场环保工作措施 ....................................................................................................... 55

第11章 雨季施工措施 ..................................................................................................... 56

11.1 雨季施工 ............................................................................................................................... 56

结 束 语 ......................................................................................................................... 57

致谢 ............................................................................................................................... 58

参考文献 ............................................................................................................................. 59

附录 ..................................................................................................................................... 60 Mass Concrete Construction ............................................................................................ i

篇三:房建毕业设计-计算书

本科毕业设计(论文)

题目:

咸阳市实验中学新校园-办公楼设计(B方案) 院 (系):建筑工程学院专 业: 土木工程 班 级:学 生: 学 号: 指导教师: 2013年 06月

本科毕业设计(论文)

题目:

咸阳市实验中学新校园-办公楼设计(B方案) 院 (系):建筑工程学院专 业: 土木工程 班 级:学 生: 学 号: 指导教师: 2013年 06月

前 言

毕业设计是大学本科教育培养目标实现的重要阶段,是毕业前的综合学习阶

段,是深化、拓宽、综合教和学的重要过程,是对大学期间所学专业知识的全面总

结。通过毕业设计,可以将以前学过的知识重温回顾,对疑难知识再学习,对提高个

人的综合知识结构有着重要的作用。通过毕业设计,使我们在资料查找、设计安

排、分析计算、施工图绘制、口头表达等各个方面得到综合训练,具备从事相关

工作的基本技术素质和技能。

目前,我国建筑中仍以钢筋混凝土结构为主,钢筋混凝土造价较低,材料来

源丰富,且可以浇筑成各种复杂断面形状,节省钢材,承载力也不低,经过合

理设计可以获得较好的抗震性能。今后几十年,钢筋混凝土结构仍将活跃在我

国的建筑史上。框架结构体系的主要特点是平面布置比较灵活,能提供较大的

室内空间,对于办公楼是最常用的结构体系。

多层建筑结构的设计,除了要根据建筑高度、抗震设防等级等合理选择结构

材料、抗侧力结构体系外,要特别重视建筑体形和结构总体布置。建筑体形是指

建筑的平面和立面;结构总体布置指结构构件的平面布置和竖向布置。 建筑体

形和结构总体布置对结构的抗震性能有决定性的作用。

毕业设计的三个月里,在指导老师的帮助下,经过查阅资料、设计计算、论

文撰写以及图纸绘制,加深了对规范等相关内容的理解,巩固了专业知识,提高

了综合分析、解决问题的能力。并熟练掌握了天正AutoCAD软件,基本上达到

了毕业设计的目的与要求。

框架结构设计的计算工作量很大,在计算过程中以手算为主,由于自己水平

有限,难免有不妥和疏忽之处,敬请各位老师批评指正。

西安工业大学毕业设计(论文)任务书

院(系) 建筑工程专业土木工程 班 姓名 学号

1.毕业设计(论文)题目:

2.题目背景和意义:

本次设计的主要任务是设计一幢满足办公功能要求的咸阳市实验中学新校园-办公

楼。该建筑物主要设计概况为:(1)批准建筑面积约4000平方米;(2)建筑层数5层;(3)

结构形式选用钢筋混凝土框架结构;(4)建筑物耐久年限为50年;(5)建筑物设计耐火等

级为二级, 分类为二类;(6)建筑抗震设防类别为丙类,结构安全等级为二类,抗震设防

烈度采用该地区基本烈度7度,设计基本加速度值为0.15g,设计地震分组为第一组,结构

抗震等级为:框架三级。 通过本次毕业设计,全面考查了学生所学课程和专业知识,以及综合运用所学知识

解决实际工程问题的能力;培养学生通过查阅相关规范和资料进行建筑方案设计和结构计算的动手能力,提高学生利用计算机工具和专业软件绘制建筑图纸和进行结构计算的应用能

力。

3.设计(论文)的主要内容(理工科含技术指标):

本设计的主要内容:

(1). 根据设计要求合理布置,考虑建筑造型,确定建筑方案,完成建筑说明书。

(2). 绘制建筑平面图、立面图和剖面图等。

(3). 确定上部结构设计方案和结构布置。根据建筑设计、结构承重和抗震方面的

要求,以及场地地质条件,现场材料供应以及施工技术等,合理确定上部结构方案,进行结

构布置。

(4). 选取一榀横向框架进行结构计算(手算),内容包括确定框架的计算简图,荷

载计算,内力计算,内里组合及梁、柱截面配筋计算。

(5). 绘制框架结构施工图,完成设计说明书和结构计算书。 本设计的主要技术指标:

(1). 气象条件:温度为夏季极端最高38℃,冬季极端最低-8℃;基本风压为

220.35kN/m。基本雪压为0.2 kN/m。

(2). 工程地质条件:自然地表下1米内为填土,填土下层5米厚黄土状土,再下

为3米厚砂质粘土,再下为砾石层,地下水位为-5.4米,建筑场地为Ⅱ类场地土,地面粗

糙度为B类,各土层的地基承载力特征值如下:黄土状土fak =100~120 kN/m;砂质粘土fak

222=220~270 kN/m;砾石层fak =300~400 kN/m。

(3). 建筑抗震设防类别为丙类,结构安全等级为二级,抗震设防烈度为8度,设

计基本加速度值0.20g,设计地震分组为第一组,结构抗震等级为框架三级。

(4). 施工条件和能力:本地区有木材加工厂、钢窗厂、铝合金门窗厂、钢筋混凝土预制构件厂、商品混凝土供应厂、机械化供应站等可为施工服务。水、暖、电线路皆有本

建设厂所原有线路接来。

4.设计的基本要求及进度安排(含起始时间、设计地点):

基本要求:① 建筑方案设计合理、结构设计方法和参数选用正确;② 结构计算书书写正确、条理清晰,文字简练;③ 设计图纸能够正确表达设计设计要求、符合相关制图标准、图面布置合理。 进度安排: 熟悉设计任务,收集相关设计资料 第1周

建筑方案及建筑设计 第 2~3 周结构计算简图及荷载计算第 4~5 周

框架结构内力与位移计算第 6~8 周

内力组合及截面设计 第 9~11 周

整理设计说明书和计算书第12~13周

图纸绘制 第14~15周

收尾及答辩第 16周

5.毕业设计(论文)的工作量要求

*① 实验(时数)或实习(天数): 50机时;实习(14天)

*② 图纸(幅面和张数): A1~A2图幅,不少于10张

③ 其他要求: 主要设计说明和结构设计计算书,15000字左右

指导教师签名:年 月 日

学生签名: 年 月 日

系(教研室)主任审批: 年 月 日

说明:1本表一式二份,一份由学生装订入附件册,一份教师自留。

2 带*项可根据学科特点选填。

毕I-2

Copyright @ 2012-2024华乐美文网 All Rights Reserved. 版权所有